Displaying items by tag: fertility control clinic
The High Court, Abortion Clinic Speech Restrictions and the Assessment of Harm
This article is taken from the Western Australian Legal Theory Association and is reproduced here with permission. The entire document can be downloaded at the WALTA website here: Dr Joseph Turner (B Med Sc (Hons), MBBS, Ph D, FRACGP, FARGP, FACRRM and DRANZCOG (Advanced)* Debbie Garratt (BN, Grad Dip Counselling, B Ed, M Ed (La Trobe), PhD candidate (UNDA)** Dr Simon McCaffrey (MBBS (Hons Class II), MRCOG, FRACOG and FRANZCOG)***
The High Court will consider in October the constitutionality of Victorian and Tasmanian laws prohibiting protesting, offers of assistance and other types of communication around abortion clinics. Those supporting the laws claim that they are needed considering the significant harm that may be caused by this conduct. There are, however, substantial problems with the medical evidence provided to the High Court in support of such claims. This article critiques this evidence and highlights key questions that remain unaddressed by the expert medical opinion.
The Bubble Zone
At the beginning of 2015, the Victorian ALP Government rightly removed the Coalition's "move on" laws from the statute book. Rightly so, as the laws were intended really to prevent unions protesting. The laws were seen as an unfair restriction on free speech, with Attorney General, Martin Pakula, proclaiming that: "Victoria doesn't need Bjelke-Petersen-style laws designed to silence dissent and outlaw peaceful protests." At year's end, a total back flip by Victorian Labor with its MPs denied a free vote and totally under the thumb of Emily's List. Why not a conscience vote? After all the issue, like 2008, was about abortion on demand and not about a mother’s health.

