Displaying items by tag: liberalism
There May Be Some Hope Yet
The Gays Are Not For Turning
The Victorian Parliament recently passed horrific legislation designed to solve a problem that does not exist and, in doing so, trod all over the rights of families, medical practitioners, those experiencing unwanted same sex attraction and the Church.
Abbott and Trump
Losing Trump was just like losing Abbott. Two feisty conviction politicians with much in common have been lost to the West. Their many enemies are grinning. We will miss them both. (A version of this article appears in the 6 February 2021 edition of The Spectator Australia).
The Hexagon of Tyranny
We are facing a six-headed monster of tyranny. Freedom is on the line, as Western, so-called democratic governments have trashed our basic human rights. How much do we know, or care?
Scotties and Chotties - A Marriage Made in Covid
We now inhabit a strange world where politicians and health bureaucrats, working in tandem, run just about every element of our lives. This weird new system has replaced democracy as we once knew it, and it may not be over any time soon. We should all find this quite chilling. And sinister.
Time to Play Dirty? Lessons from the David Starkey Affair
Cancel culture is all around. It crushes rational debate and destroys freedom of thought and speech. The latest victim is the eminent British historian David Starkey, caught up cruelly in the Black Lives Matter debate. His cancellation raises important questions for how those who value freedom fight against leftist revolutionary thought and practice.
When Hayek Met Habermas
The modern culture wars have their genesis in a most unfortunate marriage of convenience between two intellectual and political movements. The proponents of economic liberty and the cultural marxists who emerged in the 1960s found common cause in radical individualism, in the 1980s. And we have all suffered since.
The Photios Industrial Complex and the Degrading of Politics in the "Premier State"
There is something rotten in the State of New South Wales. The State is run by paid lobbyists who control the Liberal Party. And the interests and philosophies of these puppeteers are decidedly not those of mainstream folks who believe, naively, that they control the governments that they vote for. The governments are puppets.

