Displaying items by tag: progressives
The Gays Are Not For Turning
The Victorian Parliament recently passed horrific legislation designed to solve a problem that does not exist and, in doing so, trod all over the rights of families, medical practitioners, those experiencing unwanted same sex attraction and the Church.
Abbott and Trump
Losing Trump was just like losing Abbott. Two feisty conviction politicians with much in common have been lost to the West. Their many enemies are grinning. We will miss them both. (A version of this article appears in the 6 February 2021 edition of The Spectator Australia).
The Light Ages
It is fashionable to deride the Middle Ages. "Medieval" is normally an insult, a term of abuse. A new book begs to differ. Pondering the lessons of the book, one is drawn to massive contrasts between our own age and that of "the medievals". And the contrasts are mostly not in our favour.
This is What Progressives Think About Your Freedoms
One of the major differences between conservatives and progressives is that we demand protections for all citizens, whereas in general, progressives demand rights for their adherents exclusively. This difference has been particularly noticeable during the campaign for marriage equality, although it shows up across the board. Progressives have taken to openly criticising us for our desire to preserve our freedoms. Gay rights activist, Rodney Croome, goes so far as to say that for conservatives - whom Croome refers to as the radical right - the fear of losing freedoms is actually an attempt to gain power:

