Displaying items by tag: roe v wade
Norma McCorvey (Jane Roe), RIP
A leading figure in the abortion wars – on both sides – has just passed away. Norma McCorvey was the “Jane Roe” of the 1973 American abortion decision, Roe v Wade. Later she became a Christian and worked tirelessly on behalf of the unborn. She died yesterday at age 69. Her famous story has been told countless times. Most would know her for the US abortion case that struck down the laws of all 50 states on abortion. But perhaps not as many know that she later (in 1995) became a Christian and a strong prolifer, and then converted to Catholicism in 1998. She wrote two books on her life and her amazing turnaround: I am Roe (with Andy Meisler – HarperCollins, 1995) Won by Love (with Gary Thomas – Thomas Nelson, 1997) The Roe v Wade case may be very well known, but many do not know how McCorvey was just a victim in all this. She did not want an abortion, and was simply used by the pro-abort crowd for their own mischievous ends.

