Welcome

It’s been a busy couple of weeks in terms of the ongoing transformation of America so let me catch you up.

Does anyone else see it as ironic that the squelching of conservative speech has been placed into overdrive since Americans elected a conservative president?

Most Western media personnel, politicians, and commentators will overwhelmingly have one standard for Muslims and another for Christians – both in terms of what they do and what is done to them. The double standards here are as odious as they are obvious. And we again have a perfect example of this with the way  Christchurch and Sri Lanka have been handled.

If you are reading this article – or this website – you are doing well. I really do not believe both will be around a whole lot longer – not the way the crackdown on free speech is going. Throughout the West the forces of intolerance and bigotry – yes, the secular left – are doing all they can to stamp out all points of view but their own.

And leading the way here is how the left is seeking to make all criticism of Islam illegal.

Sunday, 11 November 2018 08:09

More on the Melbourne Moslem Terror Attack

Written by

Islam and terrorism go together like, well, Islam and terrorism. While non-Muslims can commit acts of terror, and while not all Muslims are terrorists, we do know that the overwhelming majority of terrorist attacks since September 11 for example have been carried out by Muslims in the name of Islam. But the ‘M’ and ‘I’ words are hardly ever mentioned as each new incident of this occurs. Indeed, our authorities and the mainstream media are often loath to use the ‘T’ word as well. Usually, instead of speaking about terrorism, we hear about ‘lone-wolf attacks,’ those who are ‘mentally ill,’ and so on. The obfuscation, excuse-making, and cover-ups are getting to be as routine as the attacks themselves. Yesterday’s attack in Melbourne by a Muslim terrorist – the most recent of a string of such attacks – was yet another good illustration of all this. Our secular left media outfits refuse to give us the whole story of what is happening. For example, I just looked at a lengthy online ABC article on the attack, and there was no mention of the I or M words. mobile.abc.net.au/news/2018-11-09/bourke-st-attacker-shot-after-car-fire-stabbings-one-dead/10483608?pfmredir=sm&fbclid=IwAR3IDRy0XLUqD3CnQ7rrSPaSdZiG-ZmAVUm8xA2WmFCN29vzKUt9oaE8NUA

Thankfully not all media outlets here are guilty of such cowardice and grovelling before the political ideology known as Islam. The Weekend Australian today had its front page devoted to this latest jihad attack, and the big, bold headline said this: “Violent Islam strikes Bourke St”. Well done. Queensland MP George Christensen was right to say this: “Thank goodness one Aussie media outlet isn’t afraid to say it as it is. This is not violent extremism, mental illness, disaffected youth violence or some other politically correct term: it is radical, violent Islam, plain and simple. If you cannot identify your enemy or their ideology, you will never defeat them.” Thank you Weekend Australian and thank you George. You offer us a breath of fresh air in a culture in which creeping sharia and stealth jihad are growing increasingly pervasive and untouchable. In my article on this attack yesterday I said I would offer updates: billmuehlenberg.com/2018/11/09/life-and-death-in-melbourne/ Here then are some further developments concerning this horrific attack, both coming from the Daily Mail:

The brother of the knife-wielding Somali terrorist who stabbed three men, one fatally, in Melbourne’s inner-city has been revealed as an ‘ISIS sympathiser’ who allegedly planned to execute a major terrorist attack. Mohamed Khalif, also known as Hassan Shire, 31, was shot and killed by police after deliberately crashing a car filled with ‘barbecue-style gas bottles’ and rampaging through Melbourne’s Bourke Street with a long knife on Friday afternoon. In a press conference, Victoria Police Chief Commissioner Graham Ashton said Khalif was well known to counter-terrorism officials due to his relatives’ links to terror. Khalif’s 21-year-old brother, Ali Khalif Shire Ali, was arrested in November of 2017 in relation to a foiled terror attack in Federation Square, also in the heart of Melbourne. Police allegedly intercepted plans late last year to attack Melbourne’s cultural arts precinct on New Years Eve 2017. www.msn.com/en-au/news/australia/somali-born-terrorist-who-carried-out-bourke-street-attack-is-the-brother-of-an-isis-sympathiser-whose-bomb-plot-was-foiled/ar-BBPwqOa?ocid=spartandhp&fbclid=IwAR13-lBparhP5J2_kW_0_aNG8d-voazsehYjWi1ww_7j5CL2s-aaaSlQYy8
And a more recent update:
A house linked to the Somali terrorist who stabbed a man to death and injured two others in Melbourne’ Bourke Street before being shot by police has been raided by counter-terrorism officers. Heavily-armed officers wearing tactical gear and masks swooped on the home in Werribee about 8am on Saturday as they continue to investigate Hassan Khalif Shire Ali’s attack. The house is believed to be that of the lone wolf terrorist’s father, who also brought up Khalif’s brother Ali Khalif Shire Ali who allegedly plotted an attack on Melbourne’s Federation Square on New Year’s Eve. His family are inside the house and cooperating with authorities. Khalif’s wife, who police also believe to be radicalised, was missing on Friday night but has since been interviewed by police. www.dailymail.co.uk/news/article-6373671/Police-raid-terror-den-linked-Bourke-Street-Jihadi.html
Also, Andrew Bolt has offered us a running list of other refugees who committed acts of Islamic jihad on Melbourne’s streets. And this is now becoming rather predictable:
Past terrorist attacks by Muslim refugees here: -Somali-born Yacqub Khayre [in June, 2017] murdered a worker at a Melbourne apartment block, held a woman hostage and shot three police after telling Channel 7: “This is for IS, this is for al-Qaeda.” Before that: -Farhad Jabour, an Iranian “refugee”, killed police accountant Curtis Cheng while shouting “Allah is the greatest”. -Man Monis, an Iranian “refugee” and Islamist, staged the deadly Lindt cafe siege while professing support for the Islamic State. -Numan Haider, an Afghan “refugee” and IS recruit, stabbed two police in Melbourne. -Mohammad Ali Baryalei, an Afghan “refugee”, became a recruiter and fighter for IS. -Saney Edow Aweys, a Somalian “refugee”, plotted to attack the Holsworthy Army base.
Not all of these cases were in Melbourne – the Man Monis attack was in Sydney. But this is becoming all too routine and commonplace. We let in Muslim refugees, they act out their Islamic faith, and we scratch our heads and wonder why we keep seeing all this carnage repeated. Yesterday I quoted one legal expert who made the case for clamping down on this. I repeat part of what he said:
The problem is that we simply do not know who to trust amongst a religious group that largely despises our democracy, culture and laws, and that do not even accept the principle of religious tolerance and separation of powers. Although jihadists are not drawn exclusively from the first-generation Muslim immigrants, a large Muslim immigration to Australia invariably provides a larger recruiting ground for terrorists and other Islamist militants. Both the influx of asylum seekers from dysfunctional majority-Muslim countries and the constant influx of Muslim immigrants to Australia naturally exacerbate the threat of Islamic terrorism on our soil.
Surely our experience, and that over other Western countries, demonstrates that we need to rethink our immigration policies, and we need to start getting real about where the actual threats are coming from. Until we do, we will keep seeing more blood on our streets and keep wondering why so many innocent men, women and children must keep on being murdered – all to appease a violent religious ideology.
Monday, 04 June 2018 12:19

Tommy Robinson and the Death of Britain

Written by

[Photo credit: Tommy Robinson / Youtube. Bill has had some criticism via social media for defending the likes of Tommy Robinson and Geert Wilder. Here's his response to that, with which I heartily agree: "Some folks make it their mission, however imperfectly, to expose things like horrific rape gangs. Some folks prefer to be armchair critics and attack these watchmen. I know which group of people I will side with, any day of the week. The former group will heavily pay for this, often with their very lives. The latter group sacrifices nothing."] Less than a week ago English activist Tommy Robinson was sentenced to 13 months in prison. Given that he has been doing his best to warn about creeping sharia in general, and Islamic rape-gangs in particular, and that he will be surrounded by Muslim inmates, we can fully expect he will be murdered in prison. That is one way to deal with those who seek to expose the evil which abounds in the UK today. Simply silence those who dare to alert others to what is going on. If he is killed while in prison, the powers that be can look the other way and just keep going on with business as usual. Just in case you have no clue as to who he is, and what his “crime” was, this news item offers a brief summary:

U.K. right-wing activist and journalist Tommy Robinson was arrested and reportedly jailed Friday after he filmed members of an alleged child grooming gang entering a court for trial – but the details of his purported sentence remain murky after the judge ordered the press not to report on the case. Robinson, the former head of the English Defense League and a longtime activist against Islam and Islamic migration, was arrested after he was filming men accused of being part of a gang that groomed children. Britain has been rocked by a series of child sex scandals perpetuated by gangs of predominantly Muslim men. www.foxnews.com/world/2018/05/26/right-wing-activist-tommy-robinson-reportedly-jailed-after-filming-outside-child-grooming-trial.html

Ezra Levant offers more detail:

Tommy did nothing wrong. But suddenly, seven police officers swarmed Tommy and threw him in the back of a police van. They said he was causing a disturbance, which is absurd — he was by himself on the street, with only a cameraman and a friend. But it got worse. Much worse. Within hours, Tommy was summoned before the judge. Tommy’s long-time lawyer was not informed of this. Rather, the court appointed a lawyer who didn’t know Tommy and wasn’t an expert in the specialized law of contempt of court. In a matter of minutes, Tommy was sent to prison — with a 13-month sentence. He is now in HM Prison Hull, a brutal facility near Leeds. A 13-month prison sentence for Tommy is tantamount to a death sentence — every Muslim criminal in prison will be trying to murder him. They’ve tried before. The only alternative is for Tommy to request to be put into solitary confinement — but no-one can live that way, locked up without any human contact for 23 hours a day. Not for a year straight. www.therebel.media/let_us_report_on_tommy_robinson

Commentator Bruce Bawer says this about the case:

-The swiftness with which injustice was meted out to Tommy Robinson is stunning. No, more than that: it is terrifying. -Without having access to his own lawyer, Robinson was summarily tried and sentenced to 13 months behind bars. He was then transported to Hull Prison. -Meanwhile, the judge who sentenced Robinson also ordered British media not to report on his case. Newspapers that had already posted reports of his arrest quickly took them down. All this happened on the same day. -In Britain, rapists enjoy the right to a full and fair trial, the right to the legal representation of their choice, the right to have sufficient time to prepare their cases, and the right to go home on bail between sessions of their trial. No such rights were offered, however, to Tommy Robinson.

He concludes:

For my part, I cannot for the life of me fathom why not a single prominent or powerful individual in all of the United Kingdom has come forward to challenge the mistreatment of Tommy Robinson – and thereby stand up for freedom of speech. Is the whole British establishment a bunch of cowards? I suppose we will know the answer to that question soon enough, if we do not know it already. www.gatestoneinstitute.org/12378/tommy-robinson-injustice

Mark Steyn put it this way: “You can say a lot of things about Tommy Robinson, but he’s one of the embarrassingly small number of Britons who recognizes the horror inflicted on those young and vulnerable girls on the receiving end of “diversity” and seeks to do something about it.” www.steynonline.com/8675/tommy-this-an-tommy-that-an-tommy-go-away Or as Joshua Winston writes:

If the government were at all smart and strategic, they would hire Tommy Robinson as an adviser on terrorism. He has consistently identified extremists, because he grew up among them in Luton. He has consistently told us the names of the mosques that are churning out radicals, as well as naming the imams. He has been right time after time, and instead of hiring Tommy (whose information could contribute to keeping us all safe), our government bent down to the MCB and MEND, both of whom have ties to extremists. All of this is okay with our government, because these Muslim organisations bring with them the Muslim voting bloc, and so the parliamentary doors are flung wide open to them at the same time that our liberties get thrown out the window. www.jihadwatch.org/2018/05/tommy-robinson-will-be-the-uks-tipping-point

And if you know nothing about the rape-gangs which have terrorised thousands of young girls in the UK, I refer you to an earlier piece of mine. There I said:

The Mirror’s 18-month investigation reveals abuse on unprecedented levels. We found: -Social workers knew of abuse in the 1990s but police took a decade to launch a probe. -Council staff viewed abused and trafficked children as “prostitutes” instead of victims, according to previously unseen files. -Authorities failed to keep details of abusers from Asian communities for fear of “racism” -Police failed to investigate one recent case five times until an MP intervened. -One victim said cops tried to stop her finding out why her abusers had not been prosecuted because they feared she would talk to us. -The scale of the abuse uncovered in Telford – population 170,000 – is feared to be the most brutal and long-running of all. -The Rotherham toll was put at 1,500 – but that was in a community of 260,000.

And read especially this please:

Night after night, I was forced to have sex with multiple men in disgusting takeaways and filthy houses. I must have been getting the morning after pill from a local clinic at least twice a week but no one asked any questions. I fell pregnant twice and had two abortions. Hours after my second termination, I was taken by one of my abusers to be raped by more men. The worst moment came just after my 16th birthday when I was drugged and gang raped by five men. Days later, the ringleader turned up at my house and told me he’d burn it down if I breathed a word of what had happened. billmuehlenberg.com/2018/03/17/the-rape-of-a-culture-the-death-of-england/

There is only one thing worse than this horrific sexual abuse, and this totalitarian trampling of freedom of speech, and the reprehensible treatment of the whistle-blower Tommy Robinson, and that is the appalling and damnable apathy and indifference of most people. Why do I suspect that 99 per cent of folks will never give a rip about Tommy and all this until – God forbid – their own daughter is savagely assaulted by rape gangs – usually Muslim rape gangs? The truth is, those who don’t care about all this are just as guilty of these horrific cases of sexual assault as the rape gangs are. There is a petition circulating on this. In just around four days it has garnered nearly a half million signatures. Let’s make it a million – even ten million. www.change.org/p/theresa-may-mp-free-tommy-robinson A few videos – of many – on this case that are well worth watching include this two-minute statement by Geert Wilders: www.youtube.com/watch?v=Iu1JLJk0H2Y So too is Paul Weston’s 17-minute video: www.youtube.com/watch?v=_8CPF1mK9Fo And see this 3-minute video by UK MEP Janice Atkinson: www.jihadwatch.org/2018/05/uk-mep-says-tommy-robinson-arrest-politically-motivated-amid-massive-protest-in-london-over-his-arrest Finally, watch this 12-minute video by Lauren Southern: kippercentral.com/2018/05/26/watch-lauren-southern-on-tommy-robinson-arrest/ Also, be aware that rallies for Tommy were held in various Australian cities yesterday. It is said that when he heard of this news, tears came to his eyes. www.xyz.net.au/australians-rally-tommy-robinson/ I am Tommy Robinson. So are you, if you care about freedom, about democracy, and the well-being of our children.

Thursday, 24 May 2018 21:41

Face-Coverings and Testimony in Court

Written by

Should a Muslim woman who wears a face covering for religious reasons, be entitled to give evidence in court with her face covered? This important issue, which has been discussed in other common law jurisdictions, has now been considered in the NSW Court of Appeal, in Elzahed v State of New South Wales [2018] NSWCA 103 (18 May 2018). The Court concluded that no error had been shown in a ruling by a trial judge, that Ms Elzahad was not entitled to keep her face covered while testifying.

Monday, 02 April 2018 19:30

A Tale of Two Men - and Two Faiths

Written by

[Apr 1, 2018. Photo credit Herald Sun]

 Today is Easter Sunday. Christians the world over celebrate the most important event in human history: the death and resurrection of Jesus Christ. At the heart of this event is one person giving his life for others, so that they might live. This is self-sacrificing love at its greatest.

I have written often now on the deep decline of the UK, and now we may be safe to say it is just about officially dead. At the same time it is banning and detaining brave individuals who dare to speak out about the evils of sharia law and the war on freedom, UK officials are covering up and making excuses for diabolical rape gangs, most of them Muslim. As to the free speech bans, Pamela Geller and Robert Spencer have been banned from entering the country in the past, all for daring to warn about the dangers of political Islam. And more recently figures like Martin Sellner and Brittany Pettibone from the UK and Lauren Southern from Canada are getting similar treatment. While they are being excluded from the country or banned from speaking out, the UK continues to keep its doors wide open to Islamic immigration, giving Muslims privileged and preferential status.

Thursday, 28 December 2017 17:07

Responding to the Islamisation of the West

Written by

Throughout much of the West major cities have large concrete blocks placed around high-traffic pedestrian areas. So what is that all about? Works of modern art? Not quite – they are security bollards. Security from what? Well, sadly, from basically one thing: jihadists who wish to mow down innocents in the name of their political ideology. So the West is responding to this crisis – not by dealing with the root causes – but by running with band aid solutions. Instead of acknowledging that we have an Islam problem, as Tony Abbott recently pointed out, and taking appropriate steps to deal with this, we try rather useless harm minimisation approaches.

Tuesday, 28 February 2017 10:50

The Protected Perverts

Written by

here are two sorts of perverts. Those that are villified and those that are lauded.  OK, a third too: those that are simply ignored.  The past year and the past week has shown what the media can do to perverts. Priests and pederasts, paedophiles and poofters are all treated quite differently.  Child abusers come under particular scrutiny, depending on which other non-pervert factors get taken into decisive consideration. Really nasty - nay wicked - ones have been consistently ignored.  

  We spent some time in the Tavern talking of the priests a week or two back.  A chap spoke of them, almost in passing, just yesterday. We shall come to Mr Kelso in a moment.   We also spoke of the complete ignoring of politician and public servant child abuse. But first..... The past week has seen a media orgy of gluttony over a rather charismatic but flawed fellow, Milo by name. He recognises  and acknowledges his flaws but nonetheless calls out the flaws of others with some relish and a great deal of wit and barb. Were he a left-wing bigot he would be lauded by the media, but instead he is a bigot-slayer from a clearly right-wing position.  
 
  Hense the efforts made by the media which is by and large left wing to bring him down. Seemingly the mass ranks of snowflakes with masks and clubs who attempt to shut down free-speech whenever he shows up at A.N. Other University had not succeeded. Hail stones were needed. Milo is a homosexual with a penchant for grown men, as long as they are black. Clearly not a racist queer.  But as a homosexual the media can't touch him for that, as homosexual people are protected perverts. Nevertheless they gave it a go last week. Their hypocricy banner flew high. And while left wing politicians can endorse and advance paedophilia without media outrage, Milo who was abused as a youth has denied ever abusing underage boys himself. Even Mr Sulu, George Takei who has in the past revealed his own early experiences in excusing and lauditory terms does not get tarred with the Milo brush. But then Takei is a lefty. He is a protected pervert. But the conversations only brought Milo in as an aside. The real meaty stuff was about Institutionalised abuse. No-one in the right mind could say that the Catholic Church advocates child abuse. As the original and leading christian institution it consistenly preaches goodness, kindness, love of ones neighbour, just as all christian institutions do. It and they do however have some - a very small proportion - of flawed people in their ranks. They are not the norm, and Mr Kelso who has been at the forefront of chasing them down is quick to acknowledge. He had some things to say about the one institution in Australia (and elsewhere) that gets quite ignored. Whether this is by accident or design, I cannot say for certain, but one way or another it is 'Protected'. Mr Kelso had this to say:
 
We are 50 hearings into the Royal Commission into Child Abuse......... 
 
 
without a single hearing into child abuse within the Islamic community of Australia.
With systemic abuse uncovered in a number of religious organisations across the country – some sections of the public are asking questions of Muslim institutions.
 
Scores of underage Muslim girls are married off to older men. Many are forced to join polygamous marriages. Worse still, some women within the Islamic faith are forced to endure genital mutilation. Some Middle Eastern groups find this practice culturally acceptable – it is even commonplace in some communities.

   

 
The thought of defenceless young girls being forced to have sex with grown men is horrifying.
For any female to have their clitoris sliced off with a sharp knife is impossible for most of us to imagine. Australians cannot condone this practice.
Why is female genital mutilation (FGM) happening in Australia?
FGM is, of course, illegal – and specifically outlawed by the UN Convention on the Rights of the Child. It is also illegal to take a child out of Australia to have the procedure.
Yet, genital mutilation is happening in our country.
In fact, instances of genital mutilation in Australia have doubled in the past year.
According to the ABC’s analysis of ABS and UNICEF data: “around 5,640 girls under the age of 15 may be in danger, and 1,100 girls are born every year to women who may have had FGM. This means that three girls a day are born in Australia who are at high risk of being subjected to FGM.”
A recent report conducted by researchers at the Australian Paediatric Surveillance Unit at Westmead Children’s Hospital in Sydney found evidence of children as young as five months old enduring genital mutilation procedures.
 

 

Whilst the practice of FGM is not a religious one, some Islamic communities persevere with the illegal procedure in Australia. In June 2016, Islamic sect community leader Shabbir Mohammedbhai Vaziri became the first person imprisoned for female genital mutilation in Australia.
 
So far, the ONLY one.
 
FGM is a cultural practice in some regions within Malaysia, Indonesia, The Middle East and South Asia. We cannot allow FGM to happen in our country. The Royal Commission must use its powers to help make sure this horrific procedure never happens again on Australian shores.
Why hasn’t The Royal Commission investigated forced child marriage within the Muslim community?
Child welfare agencies have received 70 calls for help in the last two years.
Girls in Australia as young as nine have been sent overseas and forced to marry Muslim men.
The Australian Federal Police have investigated 69 complaints of child marriage in the last year alone.
Child marriage is outlawed in Australia.
State police forces have prosecuted Muslims participating in child marriage here.
 
The Royal Commission is an inquiry into ‘institutional responses to child sexual abuse’. It is not an Inquiry into child abuse in families. In order to classify as ‘institutional abuse’ and to attract the jurisdiction of the Royal Commission there must be an institutional connection.
Any child sexual abuse with the involvement or approval of an Islamic cleric would pass as institutional abuse.
Therefore the Royal Commission may investigate victim stories of underage child sex, forced child marriages, and genital mutilation of girls under 18.
So why hasn’t the Royal Commission done anything about this?
This is why.
 
The Christian Churches are hounded as though the 'systematic (as he calls it) incidents of child abuse were 'approved' or taught as a Christian thing to do.  It is not; they were not. But Muslim preachers advocate it, preach it, oblige it. It is little use to do even as Mr Kelso does, of offering protection by saying it is not 'Institutional' or not 'Muslim'.
Of course it is.
But no Royal Commission has demanded an Immam front the court. Why not? Perhaps they have no interest in the 'whole truth'. Bill had something to say about that:
Here are some truths you can bank on:
-Truth number one: Islam treats women as second class citizens.
-Truth number two: Much of the West treats Islam as a protected species.
-Truth number three: Much of the mainstream media will always rally to the defence of Islam.
We see this occurring every day. It is infuriating of course. The real mind-bender is the near universal silence of the leftists and the feminists whenever these cases of Islamic misogyny and sexism take place. Indeed, they will almost always defend Islam at all costs instead of denouncing it.
Meanwhile the media focuses on Milo. I pulled a pint for Mr Kelso and for Bill for their points. Pax